Welcome to your estimationmcqpaper-1
1. The unit of measurement in per quintal for
2. The damp proof course is measured in
3. The most reliable estimate is
4. The measurement is NOT made in square meter in case of
5. For 1 sqm. single brick flat soling (conventional size) the number of brick required is
6. The quantity of brickwork in foundation and plinth per day per mason should be
7. The woodwork should be measured to nearest
8. If 'd' be the diameter of MS of tor steel bars in mm, the standard weight (in kg) per meter of the bar is
9. The following documents contains detailed description of all items of work excluding their quantities along with the current rates
10. The floor area included the area of the balcony upto
11. Administrative head of public work department who is directly responsible to government is
12. The quantity of wood for the shutters of doors and windows is calculated in
13. The value of property during its useful life based on purchased value and depreciation etc. is known as
14. The thickness of plaster is usually
15. The value of the property at the end of its useful life (without being dismantled) is known as
16. Pick up the item of work NOT INCLUDED in the plinth area estimate
17. A work costing Rs. 20,000 is termed as
18. Most accurate method of estimation is based on
19. One brick thickness of wall is roughly equal to
20. Find depreciation during first five years of a cement concrete structure is