Estimation Costing MCQ Paper – 3

Welcome to your estimationcostingmcqpaper-3

1. Whenever the white washing on distempering is done on corrugated iron sheets, in the estimation the plan area of the sheets is increased by

2. The following item of earthwork is not measured separately

3. The expected out turn of 2.5 cm cement concrete floor per mason per day

4. Pick up the excavation where measurements are made is square meters for payment.<br>(

(A) Ordinary cutting up to 1 meter
(B) Surface dressing up to 15 cm depths
(C) Surface excavation up to 30 cm depts

5. Brickwalls are measured in square meters if the thickness of the wall is

6. The brick-work is measured in square meter in case of

7. Pick up the term of work not included in the plinth area estimate

8. what is the approximate cost of the complete labour a percentage of the total cost of the building

9. The nominal lead and lift allowed for the earthwork in the excavation of the foundation are

10. Working out the exact quantities of various items of work is known as

11. The covered area of a proposed building is 150 sqm. and it includes a rear courtyard of 5m x 4m. If the prevailing plinth area rate for similar building is Rs. 1250/sqm, what is the cost (in Rs)

12. The concrete work for the following part of the building of specified thickness is measured in square meters

13. The item of steel work which is measure din sqm. is

14. Scrap value of a property may be

15. No deduction is made for opening in estimation of masonry work up to

16. Which one of the following method is used for the approximate estimation

17. Deduction at T-junction of the wall for total length of the central line is

18. For the estimation of painted area of semi-corrugated asbestos cement sheets, percentage increase in area above plain area is

19. What is the unit of measuring cornice

20. Calculate the number of bricks in 20 cubic metres brick works