1. Calculate the area (in sqm.) of the formwork required for a beam of 2m span and cross-section dimension of 400mm x 200mm

2. The accuracy in the measurement of the thickness of slab or sectional dimension of column and beam (in centimetre) should be

3. Which of the following multiplying factor is used for the estimation of lead for cartze tracks

4. The number of the bricks delivered by an unskilled labour to a distance of 10m in a working day is approximately

5. Which of the following is the CORRECT statement for length of the Short wall, as one move from earthwork to brickwork in super structure in long and short wall method

6. Which of the following is the unit of measurement for rivets

7. Which of the following area is NOT included in the plinth area of the building

8. Threading in the iron is measured in

9. Which of the following is the purpose of the valuation

10. Which of the following unit is used for estimation of D.P.C. work

11. Calculate the quantity of sand required (in cubic meter) in 20 cubic meters of reinforced cement concrete (1:2:4)

12. Deduction at cross wall for total length of the central line is

13. Accuracy in measurement of the area should be

14. For supply Lime is measured in

15. Which of the following item is NOT a lump sum item

16. Which of the following method is used to prepare the approximate estimate

17. Which of the following estimate is carried out if the sanctioned estimate exceeds 5% due to change in the price

18. For estimation of masonry work and excavation work accuracy required in the measurement of length as compared to thickness or width is

19. Which of the following is NOT measured in cubic meters

20. Which of the following is not included in the floor area