Estimation Costing MCQ Paper – 1

Welcome to your estimationmcqpaper-1

1. The unit of measurement in per quintal for

2. The damp proof course is measured in

3. The most reliable estimate is

4. The measurement is NOT made in square meter in case of

5. For 1 sqm. single brick flat soling (conventional size) the number of brick required is

6. The quantity of brickwork in foundation and plinth per day per mason should be

7. The woodwork should be measured to nearest

8. If 'd' be the diameter of MS of tor steel bars in mm, the standard weight (in kg) per meter of the bar is

9. The following documents contains detailed description of all items of work excluding their quantities along with the current rates

10. The floor area included the area of the balcony upto

11. Administrative head of public work department who is directly responsible to government is

12. The quantity of wood for the shutters of doors and windows is calculated in

13. The value of property during its useful life based on purchased value and depreciation etc. is known as

14. The thickness of plaster is usually

15. The value of the property at the end of its useful life (without being dismantled) is known as

16. Pick up the item of work NOT INCLUDED in the plinth area estimate

17. A work costing Rs. 20,000 is termed as

18. Most accurate method of estimation is based on

19. One brick thickness of wall is roughly equal to

20. Find depreciation during first five years of a cement concrete structure is