1. Estimate for electrical wiring is prepared on the basis of
2. Which of the following tax generally not applicable to residential building is
3. The value of demolished material is known as
4. For building project estimate which method is generally used in PWD
6. Indicating works left in excavated trenches to facilitate the measurement of borrow pits are known as
7. In the analysis of rates, the profit for the contractor is generally taken as
8. The information which can not be included in drawings is conveyed to the estimator through
9. In case of steel rolling shutters, for the estimation of painted area, the plain area is multiplied by
10. The weight of 10 mm diameter mild steel rod per meter length is equal to
11. Of the total estimated cost of a building, the cost of electrification usually accounts for
12. A document containing detailed description of all the items of work (but their quantities are not mentioned) together with their current rates is called
13. The number of bricks required per cubic meter of brick masonry is
14. In the centre line method of working out volumes, for cross walls, what deduction must be made from the centre line length at each junction
15. The explosive for blasting is usually expressed in terms of
16. Whenever colour washing on Asbestos cement corrugated sheets is done, in the estimation the plain area of the sheet is increased by
17. Which of the following is the most corrected estimate
18. The technique of finding the fair price of an existing building on property is known as
19. The value of the dismantled material less the cost of dismantling is called
20. When the actual cost of construction plus certain profit is paid to the contractor then such a contract is known as