Estimation Costing MCQ Paper – 5 Welcome to your estimationcostingmcqpaper-5 1. Which of the following method is used for estimation of depreciation of building ? Constant percentage method Direct comparison method Longistic curve method Rental method None 2. Capitalized value of property is the product of Annual income and annuity Annual income and interest Annual income and sinking fund Annual income and years purchase None 3. Calculate the total quantity (cubic meter) of the coarse aggregate required for an isolated rectangular footing of size 3m x 2m, If 1:2:4 Cement concrete is sued. The depth of the footing is 600 mm. 2.05 2.46 3.16 3.82 None 4. Which of the following is the correct statement for length of the long wall as one move from earthwork to brick work in super structure in long and short wall method ? Its value decreases Its value depends upon the length of wall Its value increases Its value remains same None 5. Calculate the cost of the plastering required for a wall of 4m long, 3.5m high and 300 mm thick, if the rate of plastering is 12 per square meter. 101 168 336 426 None 6. Which of the following is the unit of measurement for the sills of windows ? Cubic meter Meter Number Square meter None 7. Which of the following area is included in the plinth area of the building ? Area of the lofts Area of barsati at terrace level Cornices Tower projecting above terrace level None 8. Accuracy in the measurement of the volume in cubic meter should be near to 0.001 0.01 0.02 0.1 None 9. Deduction for total length of the central line at the corner where two walls meet is Half of thickness of wall No deduction Thickness of wall Twice of the thickness of wall None 10. Which of the following is estimated by using a bar bending schedule ? Brick work Concrete work Earth work Steel work None 11. Which of the following is measured in square meter ? Cornice Concrete work Shuttering Steel work None 12. Which of the following statement are the CORRECT for estimation of plastering ? 1. For opening upto 0.5 sqm, no deduction is made2. For opening exceeding 0.5 sqm and upto 3 sqm, deduction is made for one faces3. For opening upto 3 sqm, deduction is made for both faces4. For ends of beams, no deduction is made 1 and 4 1, 2 and 4 1, 3 and 4 3 and 4 None 13. Chowkhat or frame of the door is measured in Cubic meter Meter Quintal Square meter None 14. Calculate the quantity of sand required for 8 cubic meter brickwork with cement mortar (1:3) 1.38 1.5 1.8 2.4 None 15. Which of the following is the multiplying factor for the estimation of lead for sandy tracks ? 1 1.1 1.2 1.4 None 16. The expected out turn (square meter) of sawing of the soft wood per mason per day is 2.5 5.5 8.5 10 None 17. Grouting of the cracks is measured in Cubic meter Meter Number Square meter None 18. Which of the following is NOT measured in square meter ? Drip course Pointing Shuttering Damp proof course None 19. Calculate the number of bags of cement required for the 12 mm thick plastering of a wall of 5 m long, 3.5 m high and 300 mm thick, if 1:3 cement mortar is used 3 4 5 6 None 20. Which of the following shows total quantities of all the items of materials required for the completion of the construction ? bar bending schedule Material statement Sundries Work charged establishment None 1 out of 4 Time’s up