Estimation Costing MCQ Paper – 6 Welcome to your estimationcostingmcqpaper-6 1. The approximate quantity (KG) of Bending and binding reinforcement of mild steel for mason per day is 200 375 450 575 None 2. What percentage of the cost of the estimate is provided for the tools and plants ? 0.02 0.05 0.10 0.15 None 3. Calculate the volume (cubic meter) of dry mortar required for 1 cubic meter brick work 0.18 0.23 0.30 0.45 None 4. The expected out turn (cubic meter) of reinforced brickwork per mason per day is 1 3 5 10 None 5. Which one is the CORRECT option for the damp proof course ? It is measured in the cubic meter It is measured in running meter It is not provided at sills of doors It is provided for half the width of the plinth wall None 6. What is the density of mild steel in quintal per cubic meter ? 7.58 78.5 490 7850 None 7. Cleaning and fixing of glass panel is measured in Cubic meter Meter Number Square meter None 8. What is the weight (KG) per meter length for 12mm diameter steel bar ? 0.8 0.89 1.1 1.4 None 9. What percentage of total cost is added in the cost of construction for contingencies ? 2 5 1 15 None 10. Central line method for estimation is suitable for Building having large number of cross wall Building having large number of junctions Walls having different widths Walls having same widths None 11. Which of the following person function as an arbitrator in public work department ? Chief engineer Junior engineer Superintending engineer Supervisor None 12. How many bags of cement are required for 14 cubic meter of cement concrete work (1:2:4) ? 58 70 88 116 None 13. The knowledge of which items is necessary for analysis of rates ? Contractor’s profit Tools and plant expenditure Task of a labour in one day All of the above None 14. According to Building Bye-laws, what is a building called when the outer face of any of its walls is on the street boundary Abut Balcony Cabin Barsati None 15. The covered area of a building measured at the floor level is called Carpet area Circulation area Sundry area Plinth area None 16. What is the formula to calculate floor area ratio (FAR) ? Total covered area / plot area Total covered area / built up area (Total covered area x plot area) / (plot area) (Total covered area + plot area) / (plot area) None 17. In masonry NO deduction is made for : Opening each upto 1000 sq.cm Opening each upto 1800 sq.cm Opening each upto 10000 sq.cm Opening each upto 1500 sq.cm None 18. A procedure of actual costing and valuing an item of work on the basis of laboourers and materials required is Day work Prime cost Provisional sum Lump sum amount None 19. The unit of measurement is square meter in case of RCC structure Hollow concrete block wall Cement concrete in foundation Pointing work None 20. Estimate the quantity of plastering (two faces) for 4m long, 3m high and 30cm thick wall 2.4 sqm 24 sqm 36 sqm 72 cum None 1 out of 4 Time’s up