In this post, we will learn about the process of Assembly of Stair Tower for Slipform at Site.
Assembly of Stair Tower for Slipform
The verticality of the stair tower shall be checked only with a plumb bob. Stair tower shall be checked for verticality at every support location. If any deviation is found it shall be corrected then and there, by adjusting support length. The deviation in verticality shall not be more than 10 mm for every 10 M of height and maximum 50 mm for the overall height.
- STACKING AND STORAGE OF MATERIALS
- Design and Construction Of Pile Foundations
- Evolution of Retaining Structures
- Glossary Relating To Bitumen And Tar
- Aluminium Formwork Refurbishment
- Safety For Hydraulic Tensioning Jacks
- Methodology of Post Tensioning Work
- Properties of Prestressing HT Strand
- Losses in Pre Stress due to Elastic Shortening
- Jack Pressure for Single and Multi Pull Stressing
- Elongation & Modified Elongation in Prestressing
- Prestressing Materials Management at Site
- Prestressing : Definitions | Advantage | Application
- Slipform – Slipform Planning at Site
- Labour Productivity Norms in Slipform
- Dismantling Procedure of Slipform
- Slipform Reinforcement Schedule Planning
- Assembly of Stair Tower for Slipform
- Assembling Procedure of Tapering Slipform
- Assembling Procedure of Straight Slipform
- Classification Of Slip Form Work
- Design Considerations of SlipForm
- Evolution of Slip Form Now a Days
- Measure Horizontal Distance Using AutoLevel
- Bulking OF Fine Aggregates
- Concrete Cube Samples Taken for Different Volume
- Grades of Concrete as per IS 456 : 2000
- Flowchart For Aluform Work At Site
- Dismantling Process of Aluminium Formwork
- Assembling Process of Aluminium Formwork
- Dismantling Of Slab Aluminium Formwork
- Dismantling Of Wall Column & Beam Formwork
- Aluminium Formwork Concreting Process
- Assembling of Wall Aluminium Formworks
- Assembly Process of Aluminium Formwork
- Aluminium Formwork Worksite Management
- What is 1.54 in Concrete
- De Shuttering Period as per IS 456
- Grade Of Concrete And Its Cement, Sand And Aggregate Ratio
- Derivation Of (d²/162) – Unit Weight Of Bar
- Volume Of Different Shapes
CARE DURING SLIP FORM OPERATIONS
1. Uniform layer of concreting.
2. Regular cleaning of shutters.
3. Penetration testing of concrete, for setting time.
4. Freeness of tapered sleeves.
5. Periodical plumb readings.
6. Adjustment for tilt & twists.
7. Prevent overflowing of concrete.
8. Maintain a freeboard of 100 mm.
9. Uniform distribution of load on the platform.
10. Lowering of unwanted materials periodically.
11. Proper handling of lasers.
12. Cooling of jacks where the temperature is very high.
13. Protection of high-pressure hose.
14. Protection of turnbuckle spindles.
15. Greasing of all moving parts / outside the shutters.
16. Ensure free movement of shutters, walers, intermediate form supports, planks and handrails.
17. The consistent quality of concrete.
18. Periodical checking of concrete slump.
19. Fixing of required setting time for concrete based on slipping speed.
I hope you find this information useful. If there is something that I have missed or I do not know, you can comment and tell me which I will try to rectify as soon as possible.
If you have liked this post of mine, then use the social link given below and share it among your friends on social media. Thanks
SHARE THIS POST, IF YOU LIKE IT !!
Padhega India Tab Hi Badhega India | पढ़ेगा इंडिया तब ही बढ़ेगा इंडिया